Front Porch Blog

EPA’s MTR Permits and Status

are here (.xls)

100% of the MTR permits (79 of 79) were kiboshed.

Why is the number of permits 79 and not 86 or 108?

Via EPA’s Q&A:

An initial list of 108 pending Clean Water Act permit applications for proposed coal mines was provided by the Corps and published at the same time as the June 11, 2009 MOU. The original group of 108 projects included 13 projects whose permit applications have subsequently been withdrawn by the mining company, 8 projects for which permit issuance was imminent and occurred prior to, or concurrent with, the publication of the list, 3 projects for which an ongoing enforcement action currently precludes a permit decision, 1 permit application not complete, 1 project for which the work does not require a permit, and 5 underground mining projects determined not appropriate for the ECP. Also, 2 additional projects were added to the original list. In summary, 31 projects were removed from the original list of 108, and 2 were added, resulting in a total of 79 projects identified as remaining on the ECP list

TAGS:

PREVIOUS

NEXT

AV-mountainBorder-tan-medium1

Leave a comment

Your email address will not be published. Required fields are marked *

Leave a Comment