REPORT
Analysis of the Mountain Valley Southgate Pipeline Project (August 1, 2019)
August 1, 2019
![](https://appvoices.org/wp-content/uploads/2010/09/MVP-Southgate-Report-Cover-August-2019.jpg)
This report finds that neither the builder nor the anchor customer of the proposed Mountain Valley Pipeline Southgate extension project have provided “convincing evidence of a need for MVP Southgate.” The report exposes the flimsy assumptions used by MVP, LLC and PSNC Energy to justify a proposed 73-mile fracked-gas pipeline, and points out existing, cost-effective alternatives to new pipeline infrastructure.